Projects
Brigdeport Harbor 05 – GIS Building
Square Feet: 7,420 sf
Structural System: Butler Manufacturing
Roof System: Butler's BR II
Project Location: Bridgeport, CT
Construction Dates: 2017
Client: PSEG Fossil LLC
Project Description:
The design and build of a one story pre-engineered metal building of Butler Manufacturing’s 3-plate structural steel with Butler’s MR-24 roofing system and MOD36 metal liner panels, cladded with Butler’s BR II metal panelswith batt insulation, bearing on cast-in-place concrete foundation and ground floor slab on grade (by others); structural steel supports for top-running overhead bridge crane and hanging cable tray;